11/19/2023 0 Comments Casa diablo iv geothermal project![]() ^ a b c d e "Welcome To The Mammoth Geothermal Complex Website | mammothpacific".As of July 14th, 2022, Ormat announced that commercial operations at Casa Diablo IV had begun. Ĭasa Diablo IV is expected to be operational by the end of 2021. In addition, on August 31, 2015, the Interior Board of Land Appeals denied an appeal made by MCWD. On June 25, 2015, the Mono County Superior Court ruled in favor of GBUAP and Ormat. GBUAP and Ormat disputed this, arguing there was no connectivity between the deep geothermal reservoir and MCWD's groundwater aquifer based on extensive research conducted on the site. In 2014, the Mammoth Community Water District (MCWD) sued the Great Basin Unified Air Pollution Control District (GBUAP) and ORNI 50 LLC (Ormat) over concerns that the power plant would compromise the water supply of Mammoth Lakes. In 2006, Ormat proposed the construction of a 30 MW binary cycle geothermal power plant called "Casa Diablo IV" that would double the generating capacity of the geothermal complex. In 2014, Ormat replaced the 30-year old equipment of MP1 in order to improve its efficiency. Two production wells were drilled and connected to the existing power plants. In 2005, the geothermal well field was expanded into "Basalt Canyon" just west of the three power stations. Mammoth Pacific 2 (MPII) and PLES-1 were both commissioned in 1990 and use the same air-cooled technology. Mammoth Pacific 1 (MP1) was commissioned in 1984 and was the first air-cooled geothermal power station in the world. The complex consists of four binary cycle geothermal power stations, each with a nameplate capacity of 10 MW. The complex is owned by Ormat and operated by its subsidiary Mammoth Pacific. Oral comments may be submitted to Margie DeRose at the Inyo National Forest, Supervisor’s Office by calling (760) 873-2424, or in person at, 351 Pacu Lane, Suite 200, Bishop, CA 93514, or at a public meeting.The Mammoth Geothermal Complex is a complex of 4 geothermal power stations located at Casa Diablo Hot Springs about 3 miles (4.8 km) east of Mammoth Lakes, California. To ensure comments will be considered, the BLM must receive them by Jan. Written comments should be submitted to: BLM, Bishop Field Office, 351 Pacu Lane, Suite 100, Bishop, CA 93514 Attn: Casa Diablo IV Geothermal Development Project Draft EIS/EIR, c/o Collin Reinhardt, Project Manager by facsimile: (760) 872-5050 or by e-mail: Subject: Casa Diablo IV Geothermal Development Project Draft EIS/EIR. The document is also available on the Internet at. Additionally, CD-ROM versions of the Draft EIS/EIR may be obtained by contacting the Bishop Field Office. The Draft EIS/EIR may be reviewed at the BLM Bishop Field Office at 351 Pacu Lane, Suite 100, Bishop, CA 93514, and the Mono County Library at 400 Sierra Park Road, Mammoth Lakes, CA 93546. The agency preferred Alternative 3 differs from the applicant's proposal in pipeline alignments and the location of one well. The proposed Casa Diablo IV plant, substation, access roads, well pads, pipelines and transmission line would occupy approximately 80 acres. A 650-ft long transmission line is proposed to interconnect the new power plant to the existing Southern California Edison substation at Substation Road. ![]() ![]() It would include construction of a new geothermal power plant and substation, up to 16 new production/injection wells, multiple pipelines and access roads. The proposed 33-megawatt Casa Diablo IV Geothermal Development Project would be built on the Inyo National Forest within existing federal geothermal leases and private lands. 6, at the Crowley Lake Community Center, 458 South Landing Road, Crowley Lake. 5 at the Mammoth Lakes Community Center, 1000 Forest Trail, Mammoth Lakes and Thursday Dec. Public meetings will be held Wednesday Dec. The Bureau of Land Management today issued a Draft Joint Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR) analyzing a proposal to develop additional geothermal resources near Mammoth Lakes in Mono County, California.Ī 60-day public comment runs through Jan. BLM Releases Draft Environmental Document for 33-MW Geothermal Project Near Mammoth Lakes
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |